Over the past week or so the turf installers have been busy installing the new “grass” in the stadium. They are not done yet. The yard markers and some of he edges are not finished yet and I think they still need to fill it in with “dirt”.
I put together a time lapse video of the progress so far. I cut out most of the night images to help speed it up a bit. If you have a powerful computer and a fast network connection, try the Large video, otherwise give the medium or iPhone size video a try. They are all three the same video with the only difference being the size and quality.
Time Lapse – Medium size ( 83MB )
Time Lapse – Large Size ( 183MB )
Time Lapse – iPhone Size ( 27MB )
Leave a Reply